Rotor Blade Assembly with Control house.

Rotor Blade Assembly with Control house.

Nacelle and two rotor blades installed.

Nacelle and two rotor blades installed.

Tower with A-frame for erection.

Tower with A-frame for erection.

Commencement of the 37 kW pilot plant site assembly. Which is performed at ground level.